Projects

Since 1999, we have been offering comprehensive services in the broadest sense of the word, including engineering support for large infrastructure and construction projects, including industrial automation, telecommunications, power engineering, and air conditioning.

1. Investment

Turnkey EPC construction of a complete and modern installation complex, including a Decarbonized Water Installation, a Sludge Separation Installation, a Water Demineralization Station, and a Condensate Treatment Plant, at the Production Plant in Płock.

Description

Atrem S.A. as a Partner of the Seen-Atrem Consortium is responsible for the comprehensive implementation of works in the power, telecommunications and I&C sectors

Investor / client

PKN Orlen S.A.

Gross contract value

311,5 mln

2. Investment

Modernization and implementation of hydrological measurement, control and teletechnical systems at the hydrotechnical facilities of RZGW Kraków and RZGW Wrocław.

Description

Atrem S.A. as a Partner of the T4B-Atrem Consortium is responsible for the comprehensive implementation of works on designated facilities

Investor / client 

Państwowe Gospodarstwo Wodne Wody Polskie

Gross contract value

98 mln

3. Investment

Construction of the 110/15 kV Leszno Zachód station together with the power line, transformers and construction of MV inputs.

Description

General Contractor

Investor / client 

Enea Operator Sp. z o.o.

Gross contract value

48 mln

4. Investment

Construction of the Słubice Power Supply Station Zone with 110 kV and 15 kV line connections.

Description

General Contractor

Investor / client 

Enea Operator Sp. z o. o.

Gross contract value

47 mln

5. Investment

Expansion of the offshore part of the Liquefied Natural Gas Regasification Terminal in Świnoujście.

Dominant industry

Atrem S.A. responsible for the implementation of part of the teletechnical installations

Investor / client 

PORR S.A.

Gross contract value

34 mln

6. Investment

Construction of the 110 kV RS Siedliska power station enabling the connection of the Siedliska Traction Substation installation network of PKP Energetyka S.A.

Description

General Contractor

Investor / client 

PGE Dystrybucja S.A.

Gross contract value

16,5 mln

7. Investment

Modernisation of the 110/15 kV Polanka power station in Czarna Białostocka on the premises of the Białystok Branch of PGE Dystrybucja S.A.

Description

General Contractor

Investor / client 

PGE Dystrybucja S.A.

Gross contract value

19,5 mln

8. Investment

Reconstruction of the Chociwel HV/MV station.

Description

General Contractor

Investor / client 

Enea Operator Sp. z o. o.

Gross contract value

17,5 mln

9. Investment

Preparation of design documentation and construction works as well as other activities related to the construction of a gas station with technical and measurement parameters Q=125,000 m3/h MOP 8.4 Mpa, in the immediate vicinity of ZZU 717 Turek.

Dominant industry

Atrem S.A., as the leader of the Atrem-cGas Controls consortium, is responsible for the comprehensive implementation of works in the instrumentation, electrical power, telecommunications and construction industries.

Investor / client 

GAZ-SYSTEM S.A.

Gross contract value

8 mln

10. Investment

Construction of a 110kV main collection point power station, including technical infrastructure.

Description

General Contractor

Investor / client 

 Barlinek Inwestycje Sp. z o. o.

Gross contract value

 17 mln

11. Investment

Delivery and installation of the Tunnel Protection System at 34 stations of metro lines I and II and STP Kabaty.

Description

General Contractor

Investor / client 

Metro Warszawskie Sp. z o. o.

Gross contract value

10,5 mln

12. Investment

Construction of the 110 kV Miały power substation.

Description

General Contractor

Investor / client 

Enea Operator Sp. z o. o.

Gross contract value

10,5 mln

1. Investment

Construction of 110 kV cable lines Garbary – Cytadela, Garbary – Karolin Power Plant together with the construction of the 110/15/6 kV Garbary station.

Description

General Contractor

Investor / client 

Enea Operator Sp. z o.o.

Implementation period 

2022-2023

Gross contract value

52 mln

2. Investment

Construction of a smart grid in southern Greater Poland (South Poznań Branch) through the modernisation and reconstruction of MV and LV lines and stations, automation of lines and stations through the use of remote control and power protection automation, including short-circuit current flow indicators.

Description

Atrem S.A. as a Partner of the Elbud Poznań S.A.-Atrem Consortium is responsible for carrying out works in two of the four areas (Leszno and Wschowa)

Investor / client 

Enea Operator Sp. z o.o.

Implementation period 

2019-2023

Gross contract value

16 mln

3. Investment

Construction of a smart grid in western Poland (from Gorzów Wielkopolski) through the modernisation and reconstruction of MV and LV lines and stations, automation of lines and stations through the use of remote control and power protection automation, including short-circuit current flow indicators.

Description

General Contractor

Investor / client 

Enea Operator Sp. z o.o.

Implementation period 

2018-2023

Gross contract value

14,5 mln

4. Investment

Reconstruction of the 110/15 kV Wronki station to enable the development of renewable energy

Description

General Contractor

Investor / client 

Enea Operator Sp. z o. o.

Implementation period 

2018-2023

Gross contract value

29 mln

5. Investment

Expansion of the Gas Compressor Station in Odolanów (Baltic Pipe).

Description

Atrem S.A. as the Leader of the Atrem-JT-Projprzem Budownictwo-PJP Makrum Consortium was responsible for the comprehensive implementation of works in the power, I&C and telecommunications sectors

Investor / client 

GAZ-SYSTEM S.A.

Implementation period 

2020-2022

Gross contract value

67 mln

6. Investment

Reconstruction of the 110/15kV Międzyrzecz station – Design + Construction.

Description

General Contractor

Investor / client 

Enea Operator Sp. z o. o.

Implementation period 

2019-2022

Gross contract value

20,5 mln

7. Investment

Execution of construction works covered by Contract V: “Central Control System for the Water Production Process at the MPWiK Sp. z o.o. Waterworks Stations in Lublin”, falling within the scope of the Project entitled: “Expansion and Modernization of the Water Supply and Sewage Disposal System in Lublin – Stage III” co-financed by the European Union – Operational Programme Infrastructure and Environment 2014-2020.

Description

Atrem S.A. as a Partner of the Inżynieria Rzeszów -Atrem Consortium was responsible for the comprehensive implementation of works in the electrical power, telecommunications and I&C sectors.

Investor / client 

MPWiK Lublin

Implementation period 

2019-2022

Gross contract value

24,5 mln

8. Investment

Construction of a smart grid in western Poland (from Zielona Góra) through the modernization and reconstruction of MV and LV lines and stations, automation of lines and stations as a result of the use of remote control and power protection automation, including short-circuit current flow indicators.

Description

General Contractor

Investor / client 

Enea Operator Sp. z o.o.

Implementation period 

2018-2022

Gross contract value

12,5 mln

9. Investment

Construction of the DN1000 Goleniów – Lwówek gas pipeline together with the infrastructure necessary for its operation, including: Stage I – Goleniów – Ciecierzyce gas pipeline and Stage II – Ciecierzyce – Lwówek gas pipeline

Description

Atrem was responsible for the comprehensive implementation of works in the I&C, electrical and telecommunications sectors.

Investor / client 

GAZ-SYSTEM S.A. / JT S.A.

Implementation period 

2021-2022

Gross contract value

7,5 mln

10. Investment

Design and implementation of the project entitled "ENIGMA Museum" in Poznań.

Description

Atrem S.A. as the leader of the Atrem-FB Dota – New Amsterdam consortium was responsible for the comprehensive implementation of works in the power, telecommunications and sanitary sectors

Investor / client 

Miasto Poznań

Implementation period 

2019-2021

Gross contract value

8 mln

11. Investment

Construction of the 110 kV Górka Duchowna network switching station.

Description

General Contractor

Investor / client 

Enea Operator Sp. z o.o.

Implementation period 

2019-2021

Gross contract value

10 mln

12. Investment

Design and construction of the 110/15 kV Skwierzyna II power station, including the construction of a double-circuit 110 kV power line and the construction of MV and LV grid connections.

Description

General Contractor

Investor / client 

Enea Operator Sp. z o.o.

Implementation period 

2019-2021

Gross contract value

34 mln

13. Investment

Reconstruction of the Wałbrzych Główny railway station.

Description

Atrem was responsible for the comprehensive implementation of works in the electrical and telecommunications industry

Investor / client 

Berger Bau Polska Sp. z o. o.

Implementation period 

2020-2021

Gross contract value

4,5 mln

14. Investment

Reconstruction of the Piła Południe HV/MV station.

Description

General Contractor

Investor / client 

Enea Operator Sp. z o.o.

Implementation period 

2017-2022

Gross contract value

11,5 mln

15. Investment

Construction of the 110/30 kV GPO-Grabik power station, Gaworzyce district, together with the construction of HV-110 kV, MV-30 kV and fiber optic cable lines for the construction of the Gaworzyce-Żukowice Wind Farm

Description

General Contractor

Investor / client 

Park Wiatrowy Gaworzyce Sp. z o.o.

Implementation period 

2019-2020

Gross contract value

26 mln

16. Investment

Execution of construction, sanitary, electrical and telecommunications works, including the supply of equipment, as part of the construction of training building no. 22 at the Land Forces Training Centre in Poznań at Wojska Polskiego Street.

Description

Atrem S.A. as the leader of the Atrem-Metrotech-Budled consortium was responsible for the comprehensive implementation of works in the electrical power, telecommunications and sanitary sectors

Investor / client 

WZI Poznań / AMW Sinevia

Implementation period 

 2019-2021

Gross contract value

8 mln

17. Investment

Construction of the Mercedes engine factory in Jawor.

Description

General Contractor

Investor / client 

Mercedes-Benz Manufacturing Poland Sp. z o. o. / SPEC-BRUK Sp. z o. o. S.K

Implementation period 

2018-2020

Gross contract value

10,5 mln

18. Investment

Przebudowa Węzła Rozdzielczego Gazu Gustorzyn (WRG Gustorzyn) etap II automatyzacja procesu sterowania węzłem.

Description

Atrem S.A. as the Leader of the Atrem-Gazomet-ZM Wójcik Consortium was responsible for the comprehensive implementation of works in the I&C, power and telecommunications sectors.

Investor / client 

GAZ-SYSTEM S.A.

Implementation period 

2018-2019

Gross contract value

7 mln

19. Investment

Design and construction of a speedway stadium at 6 August 71 Street in Łódź.

Description

Atrem was responsible for the comprehensive implementation of works in the telecommunications industry

Investor / client 

Miasto Łódź / MCC S.A. ( wcześniej Molewski S.A.)

Implementation period 

2016-2019

Gross contract value

7,5 mln

20. Investment

Design and construction of the 110/15kV Recz power station together with MV-15kV network connections.

Description

General Contractor

Investor / client 

Enea Operator Sp. z o. o.

Implementation period 

2017-2018

Gross contract value

9 mln

21. Investment

Delivery, installation and commissioning along with warranty service of the Machine for WER Zabrze for processing shipments, together with software and other configuration and delivery elements listed in the OPZ.

Description

Atrem S.A. as the leader of the Atrem-Dimark consortium was responsible for the comprehensive implementation of works in the I&C, power and telecommunications sectors

Investor / client 

Poczta Polska S.A.

Implementation period 

2017-2018

Gross contract value

24 mln

22. Investment

Construction of a gas meter calibration laboratory at working pressure on the premises of TJE Hołowczyce as part of the project entitled: "Development and implementation of gas meter calibration technology at medium and high pressure in an open-closed system".

Description

Atrem S.A. as a Partner of the Techmadex Consortium - Atrem was responsible for the implementation of works in the electrical power, telecommunications and I&C sectors

Investor / client 

GAZ-SYSTEM S.A.

Implementation period 

2013-2017

Gross contract value

13 mln

23. Investment

Construction of the Science and Technology Park in Łódź.

Description

General Contractor

Investor / client 

Innowator Elektrotechniki Łódż

Implementation period 

2014-2015

Gross contract value

24 mln

24. Investment

Construction of the K-1 power station, MV-6 kV, LV-0.4 kV and fibre-optic cable lines at the PCC Rokita plant in Brzeg Dolny.

Description

General Contractor

Investor / client 

PCC Rokita S.A. 

Implementation period 

2013-2014

Gross contract value

10 mln

25. Investment

Construction of the surface part of the Underground Gas Storage Facility (UGS) Wierzchowice, stage 3.5 billion nm3, sub-stage 1.2 billion nm3.

Description

Atrem (formerly Contrast) was responsible for the comprehensive implementation of works in the power industry.

Investor / client 

PGNiG S.A. / PBG S.A. 

Implementation period 

2010-2013

Gross contract value

37 mln

26. Investment

Construction of a 26 MW wind farm in the Rymanów commune.

Description

Consortium Partner – in the scope of works in the power industry (Construction of main substation, MV cable lines)

Investor / client 

Martifer Renewables

Implementation period 

 2011-2013

Gross contract value

17 mln